Electric Vehicle (EV) Charging

Wakeland Oil/Hometown Markets

Installed 2, Level 3 Chargepoint EV charging units in paired configuration allowing two vehicles to charge at the same time and share power based on the demand. Prior to setting the charging units, the ‘Make Ready’ is completed, which includes excavation, electrical underground, panel and meter installation, running secondary wiring to the utility transformer, and … Continue reading “Wakeland Oil/Hometown Markets”
Petroleum

Zionsville Schools Fueling & Propane Makeover

Upgraded the existing fuel island to include installation of new Wayne Select remote dispensers and a propane setup with Petrovend OPW card reader pedestal added to the existing fuel management system.  
Petroleum

Meadville Quick Stop Shell

This ground-up project in Meadville, Pennsylvania consisted of installing Wayne dispensers, Veeder-Root, Dual Topaz Commander, 1 – 20,000 split 14/6 & 1 – 8,000 gallon Xerxes UST, piping, canopy, concrete and electrical.
Petroleum

Sunrise #34 Project

For the Sunrise #34 project, Oscar W. Larson Co. added fueling to an existing facility. We supplied and installed Xerxes Double wall tanks, a new canopy with Cree LED lighting, new Wayne dispensers for all grades of Gasoline, Rec fuel, and Wayne Ovation high speed diesel dispensers. This project also included the supply and install of an above ground Benecor DEF system.
General Contracting

Williamston McDonald’s

The Williamston McDonald’s project consisted of an interior/exterior remodel and ADA compliance upgrades.
General Contracting

Panera Bread Café

This project was a full interior conversion from an Au Bon Pain to a Panera Bread Café in University of Michigan’s Student Historic Union Building. The project included demolition, MEP, new floor tile in kitchen, new wall finishes throughout, ceiling tile, kitchen installation, cooler and freezer installation, POS and millwork installation, finish carpentry and detail.
General Contracting

Panera Bread Café #689

The Panera Bread Café project in Farmington Hill, MI consisted of a full interior build out of existing shell including underground electrical and plumbing, interior concrete slab, metal stud framing, insulation and sheetrock, MEP, tile, wall finishes, ceiling, fireplace, kitchen installation, POS and millwork installation, finish carpentry and detail.
General Contracting

Speedway Café

The Speedway Café multi-site interior renovation project included Demolition, Carpentry, Finishes, Electrical, Mechanical, Plumbing, & Equipment.
General Contracting

Nautical Mile BP

The Nautical Mile BP interior/exterior renovation project included the complete renovation of an old 3 bay service garage and car wash to transform the building into a much larger 3,300 SQFT convenience store & convert the carwash to a nautical style bait shop.
General Contracting

Burger King

The Burger King interior/ exterior renovation and ADA compliance project  included Demolition, Carpentry, Mechanical, Electrical, Plumbing, Finishes, Roofing, Glazing, Flatwork, Masonry, Concrete, & Asphalt.