Petroleum

US Coast Guard Station

This project for the United States Coast Guard in St. Joseph, MI, consisted of the removal of two (550 gallon) fuel tanks, implementation of temporary fuel storage, and installation of two new (2,000 gallon diesel and 550 gallon gasoline) double walled fuel storage tanks. The tank installation included saddled supports, submersible pumps, vents, a high level alarm, and spill/overflow protection.

Oscar W. Larson also provided and installed new gasoline and diesel fuel dispensing units, electrical distribution, pushbutton stations, control equipment, and associated wiring/conduit for the new fuel pumps, dispensers, and E-Stop systems.