Petroleum
DJD Grand River
This project, located in Brighton, MI, consisted of the demolition, excavation, and disposal of two (2) 10,000 gallon and one (1) 8,000 gallon underground storage tank and associated piping, and installation of new tanks and associated piping/electrical.