Petroleum

Perry School Corporation

This DEF system and lubrication system installation completed by the Oscar W. Larson Company was designed to be inside without heating controls to minimize the high costs of being exposed to the cold weather. Installation included a Graco Husky Poly Pumping System, Stainless Steel Tubing, and ReelCraft Reels with Stainless set-up.

This project was designed to be part of the maintenance system and kept out of the fueling system, which allows the system to be financially supported at 1/3 of the cost.