Installed 2, Level 3 Chargepoint EV charging units in paired configuration allowing two vehicles to charge at the same time and share power based on the demand.
Prior to setting the charging units, the ‘Make Ready’ is completed, which includes excavation, electrical underground, panel and meter installation, running secondary wiring to the utility transformer, and pouring concrete pads.