Electrical

Wesco Fruitport Station

The Wesco Fruitport project consisted of the following fueling installation by the Oscar W. Larson Company:

  • • Tank installation.
  • • Canopy installation, including install and pour of 12 canopy footers, canopy, and CREE CPY 304 canopy lighting.
  • • Veeder-Root TLS-450PLUS automatic tank gauge.
  • • Electrical
  • • APT doublewall pipe including conduitless fiberglass dispenser sumps, ridged APT entry boots, Fills with spilltainers and proper overfill drop tubes, vent line system with Stage I and proper vent caps and manholes.
  • • Four Wayne 3 plus 0 Blenders and two 3 plus 1 with IOTV, EMV, Valances, Wayne tap and bezel secure kits.
  • • Three 2hp submersible pumps including leak detectors and variable speed controllers